The Build · Developer's Adventure · Act IV

Act IVThe Build

The Development Permit is approved; the massing is set. Now the Building Permit and the construction itself — where schedule, cost, safety and quality fight for every month.
BP + construction — the loan only pays for work the lender is willing to stand behind

Bring your balance sheet from Act I

You arrive at the build with a permitted design and a construction loan. Carry over where the project stands — or keep the defaults for an average run.

How Act IV plays. Six calls decide the build: the contract, the permitting, material procurement, scope & contingency, draws, and safety. Watch the four meters — cost, schedule, safety, quality — move against each other. Your ending hands the finished building forward to occupancy and the sellout.