The Development Permit is approved; the massing is set. Now the Building Permit and the construction itself — where schedule, cost, safety and quality fight for every month.
BP + construction — the loan only pays for work the lender is willing to stand behind
Bring your balance sheet from Act I
You arrive at the build with a permitted design and a construction loan. Carry over where the project stands — or keep the defaults for an average run.
Carried from Act I
$4.45Min land
$4.0Mequity
$11.4Mloan
12 moby now
Warminghealth
What the construction is tracking
Cost control
Fair
budget & draws discipline
Schedule
Fair
the construction clock
Site safety
Fair
no incident is a small incident
Build quality
Fair
what the building is worth at handover
📖 Page 1
How Act IV plays.→ Six calls decide the build: the contract, the permitting, material procurement, scope & contingency, draws, and safety. → Watch the four meters — cost, schedule, safety, quality — move against each other. → Your ending hands the finished building forward to occupancy and the sellout.